OPERATIONAL MAP:

Land-based Crustaceans

The comprehensive Technical Readiness Assessment (TRA) and Adoption Readiness Assessment (ARA) across each operational module and twelve renewable energy technologies offers a hierarchy of implementation opportunities. Systematically evaluating the technology-sector combinations against technical maturity, performance reliability, integration complexity, and market readiness criteria, identifies which decarbonisation pathways offer immediate deployment potential versus those requiring targeted intervention or continued research investment.

This framework provides essential context for technology evaluation decisions that directly relate to operational reality. The 15 combination-specific TRA and ARA assessments ensure that operators can access technology maturity and adoption readiness information that precisely matches their operational context, eliminating the need to extrapolate from generic assessments.

Below you’ll find the following data based for Land-based Crustaceans operators.

Technology Readiness Assessments are a systematic way to evaluate whether a technology actually works reliably and can be practically implemented, assessing its technical maturity, performance capabilities, and availability in the market.

Adoption Readiness Assessments are a systematic way to determine whether the business, regulatory, and economic conditions exist to successfully deploy and sustain the technology commercially, regardless of its technical functionality.

An Advisory Template summarises and presents key information for use by industry, Government and lobby groups in considering development of policy and strategies to advance decarbonisation opportunity and activities in Australia’s aquaculture sector.

Implementation Guidelines have been prepared for each of the major operational modules across the Australian aquaculture sector.

Technical Readiness Assessment – Land-based Crustaceans

Technology Readiness Level Performance / Reliability Ease of integration Scalability Availability to purchase Overall TRA score
(1–100)
(1–9) (1–3) (1–3) (1–3) (1–3)
WEIGHTING 0.4 0.2 0.1 0.2 0.1
Solar – fixed 9 3 3 3 3 100
Solar – floating NA
Wind – fixed 9 3 3 3 3 100
Wind – floating NA
Hydroelectric 8 3 3 2 2 86
Tidal NA
Wave NA
Hydrogen 8 3 2 3 2 89
Biomass / Bioenergy 6 3 2 3 2 80
Geothermal (temperature control) 9 3 2 3 2 93
Ocean Thermal (temperature control) NA
Batteries 8 3 3 2 3 89
Microgrid 7 3 3 3 3 91
Grid connection 9 3 3 3 3 100
Alternate Fuels 8 2 2 3 1 79

Adoption Readiness Assessment – Land-based Crustaceans

Cost to purchase, install and maintain
(1–3)
Regulatory / policy environment
(1–3)
Industry readiness
(1–3)
Market / industry drivers
(1–3)
Availability of resource (broadly)
(1–3)
Overall ARA score
(1–100)
Weighting 0.3 0.2 0.2 0.15 0.15
Solar – fixed 3 3 3 3 3 100
Solar – floating NA
Wind – fixed 2 2 3 2 3 78
Wind – floating NA
Hydroelectric 2 2 3 2 1 68
Tidal NA
Wave NA
Hydrogen 2 2 3 2 1 68
Biomass / Bioenergy 2 2 2 2 1 62
Geothermal (temperature control) 2 2 2 2 1 62
Ocean Thermal (temperature control) NA
Batteries 3 3 3 3 3 100
Microgrid 3 3 3 3 3 100
Grid connection 2 3 3 3 2 85
Alternate fuels 2 2 2 3 1 67

Advisory – Land-based Crustaceans

TRA score ARA score TRA grouping
(Low ≤80, High >80)
ARA grouping
(Low ≤75, High >75)
Priority Barriers Intervention required Timeline Investment Other factors
Solar – fixed 100 100 HIGH HIGH Deploy Now None Provide incentives, policy reform Short Low Proven technology but limited to daytime production. Current energy grid feed-in tariffs are low and likely to have minimal impact on business cases.
Solar – floating NA
Wind – fixed 100 78 HIGH HIGH Deploy Now Cost to purchase, install and maintain Provide incentives, policy reform Short Medium Social licence and environmental barriers to wind turbines
Wind – floating NA
Hydroelectric 86 68 HIGH LOW Remove Barriers Availability of resource Provide incentives Short Low Availability of natural hydro resources is very low across much of Australia, with limited potential via wastewater energy recovery.
Tidal NA
Wave NA
Hydrogen 89 68 HIGH LOW Remove Barriers Availability of resource Provide incentives, policy reform Medium High Supply chain and ecosystem development required to maximise applicability
Biomass / Bioenergy 80 62 LOW LOW Long-term Watch Availability of resource, regulatory / policy environment Policy reform Medium Medium Social licence barriers to burning some biomass and residues
Geothermal (temperature control) 93 62 HIGH LOW Remove Barriers Availability of resource Provide incentives Short Low Geothermal resources are generally limited and highly variable across Australia
Ocean Thermal (temperature control) NA
Batteries 89 100 HIGH HIGH Deploy Now None Provide incentives Short Low Product development required to maximise efficiency and reduce purchase cost
Microgrid 91 100 HIGH HIGH Deploy Now None Provide incentives Short Low Smart and AI systems are still developing; further optimisation is required
Grid connection 100 85 HIGH HIGH Deploy Now Availability of resource Policy reform, regulatory reform Short Low Grid capacity and reach upgrades may be required for remote locations
Alternate fuels 79 67 LOW LOW Long-term Watch Availability of resource Provide incentives Medium High Supply chain and ecosystem development required to maximise applicability

IMPLEMENTATION GUIDELINES

A decarbonisation implementation guide has been prepared for each of the major operational modules across the Australian aquaculture sector. The guide provides a summary of Australia’s aquaculture sector, decarbonisation pathways, implementation approaches and policy and regulation frameworks. It provides business case development guidelines for evaluating decarbonisation initiatives within individual aquaculture businesses with a ranking system to be populated by a specific aquaculture business or operation to assist management with their decarbonisation investment decision-making.