OPERATIONAL MAP:
Moored Vessels
The comprehensive Technical Readiness Assessment (TRA) and Adoption Readiness Assessment (ARA) across each operational module and twelve renewable energy technologies offers a hierarchy of implementation opportunities. Systematically evaluating the technology-sector combinations against technical maturity, performance reliability, integration complexity, and market readiness criteria, identifies which decarbonisation pathways offer immediate deployment potential versus those requiring targeted intervention or continued research investment.
This framework provides essential context for technology evaluation decisions that directly relate to operational reality. The 15 combination-specific TRA and ARA assessments ensure that operators can access technology maturity and adoption readiness information that precisely matches their operational context, eliminating the need to extrapolate from generic assessments.
Below you’ll find the following data based for Moored Vessels operators.
Technology Readiness Assessments are a systematic way to evaluate whether a technology actually works reliably and can be practically implemented, assessing its technical maturity, performance capabilities, and availability in the market.
Adoption Readiness Assessments are a systematic way to determine whether the business, regulatory, and economic conditions exist to successfully deploy and sustain the technology commercially, regardless of its technical functionality.
An Advisory Template summarises and presents key information for use by industry, Government and lobby groups in considering development of policy and strategies to advance decarbonisation opportunity and activities in Australia’s aquaculture sector.
Implementation Guidelines have been prepared for each of the major operational modules across the Australian aquaculture sector.
Technical Readiness Assessment – Moored Vessels
| Technology Readiness Level | Performance / Reliability | Ease of integration | Scalability | Availability to purchase | Overall TRA score (1–100) |
|
| (1–9) | (1–3) | (1–3) | (1–3) | (1–3) | ||
| WEIGHTING | 0.4 | 0.2 | 0.1 | 0.2 | 0.1 | |
| Solar – fixed | 9 | 3 | 3 | 3 | 3 | 100 |
| Solar – floating | NA | |||||
| Wind – fixed | NA | |||||
| Wind – floating | NA | |||||
| Hydroelectric | NA | |||||
| Tidal | NA | |||||
| Wave | 5 | 1 | 2 | 2 | 1 | 52 |
| Hydrogen | 5 | 2 | 1 | 2 | 1 | 56 |
| Biomass / Bioenergy | NA | |||||
| Geothermal (temperature control) | NA | |||||
| Ocean Thermal (temperature control) | NA | |||||
| Batteries | 8 | 3 | 3 | 3 | 3 | 96 |
| Microgrid | 7 | 3 | 3 | 3 | 3 | 91 |
| Grid connection | 8 | 2 | 2 | 3 | 2 | 82 |
| Hybrid | 6 | 2 | 2 | 2 | 2 | 67 |
| Alternate Fuels | 8 | 2 | 3 | 3 | 1 | 82 |
Adoption Readiness Assessment – Moored Vessels
| Cost to purchase, install and maintain | Regulatory / policy environment | Industry readiness | Market / industry drivers | Availability of resource (broadly) | Overall ARA score (1–100) |
|
| (1–3) | (1–3) | (1–3) | (1–3) | (1–3) | ||
| WEIGHTING | 0.3 | 0.2 | 0.2 | 0.15 | 0.15 | |
| Solar – fixed | 3 | 3 | 3 | 3 | 3 | 100 |
| Solar – floating | NA | |||||
| Wind – fixed | NA | |||||
| Wind – floating | NA | |||||
| Hydroelectric | NA | |||||
| Tidal | NA | |||||
| Wave | 1 | 2 | 2 | 2 | 3 | 62 |
| Hydrogen | 1 | 1 | 1 | 1 | 1 | 33 |
| Biomass / Bioenergy | NA | |||||
| Geothermal (temperature control) | NA | |||||
| Ocean Thermal (temperature control) | NA | |||||
| Batteries | 3 | 2 | 3 | 3 | 3 | 93 |
| Microgrid | 3 | 3 | 3 | 3 | 3 | 100 |
| Grid connection | 2 | 2 | 3 | 1 | 2 | 68 |
| Hybrid | 3 | 2 | 3 | 3 | 3 | 93 |
| Alternate Fuels | 2 | 1 | 1 | 2 | 1 | 48 |
Advisory – Moored Vessels
| TRA score | ARA score | TRA grouping (Low ≤ 80, High > 80) |
ARA grouping (Low ≤ 75, High > 75) |
Priority | Barriers | Intervention required | Timeline | Investment | Other Factors | |
| Solar – fixed | NA | |||||||||
| Solar – floating | NA | |||||||||
| Wind – fixed | NA | |||||||||
| Wind floating | NA | |||||||||
| Hydroelectric | NA | |||||||||
| Tidal | NA | |||||||||
| Wave | 52 | 62 | LOW | LOW | Long-term Watch | Cost to install and maintain, Market/industry drivers, Limited availability of resource | Policy reform, Legislative reform | Medium | High | Limited wave energy resources in inshore/sheltered waters |
| Hydrogen | 56 | 33 | LOW | LOW | Long-term Watch | Availability of resource, Regulatory barriers | Provide incentives, Policy reform | Medium | High | Supply chain/ecosystem development required to maximise applicability |
| Biomass/Bioenergy | NA | |||||||||
| Geothermal (temperature control) | NA | |||||||||
| Ocean Thermal (temperature control) | NA | |||||||||
| Batteries | 96 | 93 | HIGH | HIGH | Deploy Now | Cost | Provide incentives, Promote research | Medium | Low | Product development required to maximise efficiencies and reduce purchase cost. Energy density / physical size introduces battery capacity constraints for marine applications |
| Microgrid | 91 | 100 | HIGH | HIGH | Deploy Now | None | Provide incentives | Short | Low | Still developing smart / AI systems. Product development required to maximise efficiency |
| Grid connection | 82 | 68 | HIGH | LOW | Remove Barriers | Availability of resource | Policy reform, Regulatory reform | Short | Low | Investment in grid capacity and reach may be required for remote locations |
| Hybrid | 67 | 93 | LOW | HIGH | Accelerate Development | Cost | Provide incentives, Promote research | Medium | Low | Systems development required to maximise efficiencies. Energy density / physical size introduces battery capacity constraints for marine applications |
| Alternate Fuels | 82 | 48 | HIGH | LOW | Remove Barriers | Availability of resource | Provide incentives | Medium | High | Supply chain / ecosystem development required to maximise applicability |
IMPLEMENTATION GUIDELINES
A decarbonisation implementation guide has been prepared for each of the major operational modules across the Australian aquaculture sector. The guide provides a summary of Australia’s aquaculture sector, decarbonisation pathways, implementation approaches and policy and regulation frameworks. It provides business case development guidelines for evaluating decarbonisation initiatives within individual aquaculture businesses with a ranking system to be populated by a specific aquaculture business or operation to assist management with their decarbonisation investment decision-making.




