Renewable Technologies

Hydroelectric

Hydroelectric TRL

1 2 3 4 5 6 7 8 9

Infrastructure

Hydroelectric power generates electricity by using flowing water to spin a turbine connected to a generator. The electricity produced depends on the water volume and its height above the turbine. Large hydroelectric stations often require dams to store water used to power the turbines, with this water returned to the river after use.

Pumped Hydroelectric Energy Systems (PHES) store energy using water reservoirs. During low demand, excess energy from the grid or renewable sources like wind and solar pumps water from a lower to a higher reservoir, effectively turning the upper reservoir into a giant battery. The stored energy can be quickly released by sending water through a hydroelectric turbine, generating electricity that can be fed into the grid when needed. PHES can also generate large amounts of electricity over extended periods, offering reliable and dispatchable power. The grid significance of hydroelectric power, and in particular PHES, is increasing as can play a crucial role in stabilising and supporting wind and solar resources by offering a firming capacity.

Capital Cost

The current GenCost 2023-2024 report contained no current capital cost or LCOE estimates for new-build hydroelectric projects due to the ongoing challenges in obtaining environmental approvals for large-scale dams. However, estimates of capital costs for pumped hydroelectric systems with 24 hours of storage are provided in Figure 11.

Figure 11: Capital costs for Pumped Hydroelectric Energy System (PHES) with 24 hours storage under current policy scenario [CSIRO, 2023].

Performance / Resource Assessment

In 2020, hydro power contributed 23.3% of Australia’s total clean energy and 6.4% of the country’s overall electricity. Australia has over 120 operational hydro power stations, with the majority of the hydroelectricity coming from Hydro Tasmania’s network in Tasmania and the Snowy Mountains Hydro Scheme in New South Wales. The performance of hydroelectric and PHES plants is based primarily on the water flow rate through the plant, the head of the water, plant efficiency, and reservoir management.

CASE STUDY

Kidston Pumped Hydro Project

The Kidston Pumped Hydro Project in North Queensland is Australia’s first pumped hydro project in over 40 years, the first developed by the private sector, and the third-largest electricity storage facility in the country. The project has a capacity of 250 MW and 2000 MWh of duration, providing approximately eight hours of energy storage, and is powered by a 50 MW solar farm and a planned 150 MW wind farm. Additionally, in 2020, construction started on the Snowy 2.0 project, which will connect two existing dams in the Snowy Mountains, offering 2000 MW of capacity and 350,000 MWh of storage which, once completed, is expected to power approximately 3 million homes for a week.

Figure 12: Genex Kidston Pumped Hydroelectric Energy System at the former Kidston Gold Mine in North Queensland [ARENA, 2024].